L=19 x 120s, R=10 x 120s, G=10 x 120s, B=10 x 120s
Integration:
1.52 hours
Capture software:
Artemis Capture
Guiding software:
MaximDL
Processing software:
PixInsight and Photoshop CS5
Processing notes:
Images calibrated and stacked in PI, all stretching in PS CS5. Asteroid image was superimposed on an LRGB image of the background star filed taken before the asteroid came in to view.